Activity A B C D E F G H I J K L ã ã ã ã Description SHUT DOWN EXISTING COMPUTER Disconnect wiring Remove existing computer Remove existing wiring Install new wiring Test new wiring Move in new computer Connect new wiring Install operating system Check memory Check operating system Check periphericals Preceding activities A B B D,C E C F,G H I I J,K Duration(hours) 2 5 10 20 5 3 12 4 6 2 3 4 Construct a network diagram for this project. Determine the critical path and show it on your diagram
Categories
Published
of 5
All materials on our website are shared by users. If you have any questions about copyright issues, please report us to resolve them. We are always happy to assist you.
Related Documents
Share
Transcript
  Activity Description Preceding activities Duration(hours)ASHUT DOWNEXISTINGCOMPUTER -2BDisconnect wiring A5CRemove existingcomputer B10DRemove existingwiringB20EInstall new wiringD,C5FTest new wiringE3GMove in newcomputer C12HConnect new wiringF,G4IInstall operatingsystemH6JCheck memoryI2KCheck operatingsystemI3LCheck periphericalsJ,K4 ã Construct a network diagram for this project. ã Determine the critical path and show it on your diagram. ã What is the over all duration of the project. ã Explain what would happen if independently any of the following were tohappenActibity B took 7hoursActivity G took 18 hoursActivity C took 21hoursActivity A&B COULD BE DONE AT THE SAME TIME  Network diagram: Determination of Critical path: Making a critical path each task will be represented by a box with the followinginformation.I.D=task nameE.S=earlieststartingtimeEF=earliestfinish timeT=task durationLS=lateststart timeLF=latestfinish timeWe have to determine the earliest start time and a latest finish time for all tasks.ES= earliest start timeEF=earliest finish time Move innewcomputer     Move innewcomputer  Start   Start Shutdownexisting cocomputer    Shutdownexisting cocomputer Test new wiring   Test new wiringDisconnectingwiring   DisconnectingwiringRemoveexistingcomputer    Removeexistingcomputer Removeexisting wiring   Removeexisting wiringInstall newwiring   Install newwiringCheck  peripherals   Check  peripheralsInstalloperatingsystem   InstalloperatingsystemCheck memory   Check memoryCheck operationsystem   Check operationsystem Connect New Wiring   Connect New Wiring  EF=ES+tWe begin from the start so we set t is zero (t=0). It has a duration time of 2hours soEF=0+2=2When a task has zero slack it is critical and lies on the critical path for that network configuration. Watch these tasksCarefully for a delay here will delay the entire project.The colored part in both charts are showing critical path.  Overall duration of project: The project will take 52 hour to complete.C 71710G172912H35394B 275A 022E27325F32353D 72720I39456J45472K45483L48524  Q: 2. a company needs to import programming devices for numerically controlledmachine it produces and services. The necessary arrangements for import includeconsideration paper work and managerial time which together have been estimatedto cost the company $17 per order. Each is bought at a cost of $50, is not subject todiscount. The cost of holding each item is made up of a storage charge of $2 and is acapital charge of 12% per annum of the value of stock demand is for 700programming device per year. ã Determine the EOQ & the frequency of ordering. ã Determine the total cost of the ordering policy. ã If the lead time is one month & demand can be assumed constant what should there-order lever be? Answer: EOQ = √ 2 COD/ CH= √ 2 X 175 X 700 / 2= √ 245000 / 2= √ 122500EOQ = 350 units  Total cost ordering policy Ordering cost = $ 175 per order Purchase cost = $ 50 per unitHolding cost = $ 2 per unitAnnual demand = 700 unitCost policy = 927Re-ordering level in the daysRe-order level = lead time X demand= 30 days X 19= 58 unitsIN MONTHSRe-order level = 1 X 58.33
We Need Your Support
Thank you for visiting our website and your interest in our free products and services. We are nonprofit website to share and download documents. To the running of this website, we need your help to support us.

Thanks to everyone for your continued support.

No, Thanks
SAVE OUR EARTH

We need your sign to support Project to invent "SMART AND CONTROLLABLE REFLECTIVE BALLOONS" to cover the Sun and Save Our Earth.

More details...

Sign Now!

We are very appreciated for your Prompt Action!

x