Documents

Harga Bahan Binaan Johor Jan-nov13

Description
Harga Bahan Binaan Johor Jan-nov13
Categories
Published
of 6
All materials on our website are shared by users. If you have any questions about copyright issues, please report us to resolve them. We are always happy to assist you.
Related Documents
Share
Transcript
    2013 BAHAN BINAAN BANGUNAN Disclaimer: The Government of Malaysia and the CIDB Malaysia shall not be liable for any loss or damage caused by the usage of any information obtained from this site. Source of Data: This average price is compiled by Department of Statistic Malaysia   Harga Bahan Binaan 2013 Negeri: JOHOR Building Materials Price 2013 State: JOHOR BIL BAHAN BINAAN BUILDING MATERIALS UNIT UOM  TERMA BAYARAN PAY TERMS HARGA (RM) PRICE (RM)  JAN FEB MARCH APR MAY JUNE JUL AUG SEP OCT NOV Source of Data: This average price is compiled by Department of Statistic Malaysia MT = Metric Ton or Tonne, m² = Square Metre, m³ = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit 2 Simen Cement    1 Ordinary Portland Cement, 50 kg bag Bag 60 Del 17.35 17.35 17.35 17.35 17.35 17.76 17.91 17.91   17.91   18.00 18.05 2 Ordinary Portland Cement in bulk MT 60 Del 310.00 310.00 310.00 310.00 310.00 340.00 356.00    356.00    356.00 356.00 356.00 Batu Baur  Aggregate   3 Granite Aggregate 3/4 MT 60 Del 23.00 23.00 23.00 23.00 23.00 23.00 23.00 23.00 23.00    23.00    23.00    Pasir Sand    4 Normal River Sand- Ex MT 30 Ex 15.50 15.50 15.50 15.50 15.50 15.50 15.50 15.50 15.50 15.50 15.50 5 Fine River Sand for Plastering -Ex MT 30 Ex 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 6 Normal Mining Sand MT 30 Ex 16.33 16.33 16.33 16.33 16.33 16.33 16.33 16.33 16.33 16.33 16.33 7 Fine Mining Sand for Plastering MT 30 Ex 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 24.00 Besi Tetulang Steel Reinforcement    8 Mild Steel Round Bar R10, MS146 MT 60 Del 2425.63 2428.75 2448.75 2464.38 2456.25 2415.63 2340.00 2340.00 2318.75 2318.75 2318.75 9 Mild Steel Round Bar R12, MS146 MT 60 Del 2449.17 2446.67 2463.33 2484.17 2488.33 2440.83 2353.33 2353.33 2333.33 2333.33 2333.33 10 Mild Steel Round Bar R16, MS146 MT 60 Del 2309.00 2306.00 2326.00 2361.00 2366.00 2344.00 2284.00 2284.00 2260.00 2260.00 2260.00 11 High Tensile Deformed Bar-Y10, MS146 MT 60 Del 2405.00 2380.00 2392.00 2437.00 2444.00 2436.00 2370.00 2370.00 2340.00 2340.00 2340.00 12 High Tensile Deformed Bar - Y12, MS146 MT 60 Del 2405.00 2380.00 2392.00 2437.00 2444.00 2436.00 2370.00 2370.00 2340.00 2340.00 2340.00 13 High Tensile Deformed Bar- Y16, MS146 MT 60 Del 2255.00 2230.00 2242.00 2307.00 2314.00 2316.00 2260.00 2260.00 2230.00 2230.00 2230.00 14 High Tensile Deformed Bar - Y20, MS146 MT 60 Del 2255.00 2230.00 2242.00 2307.00 2314.00 2316.00 2260.00 2260.00 2230.00 2230.00 2230.00 15 High Tensile Deformed Bar- Y25, MS146 MT 60 Del 2255.00 2230.00 2242.00 2282.00 2264.00 2266.00 2250.00 2250.00 2240.00 2240.00 2240.00 16 High Tensile Deformed Bar- Y32, MS146 MT 60 Del 2305.00 2305.00 2250.00 2300.00 2300.00 2300.00 2300.00 2300.00 2300.00 2300.00 2300.00 17 BRC A6, MS145 m 2   30 Del 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 5.77 5.77 5.77 18 BRC A7, MS145 m 2   30 Del 8.16 8.16 8.16 8.16 8.16 8.16 8.16 8.16 7.64 7.64 7.64   Harga Bahan Binaan 2013 Negeri: JOHOR Building Materials Price 2013 State: JOHOR BIL BAHAN BINAAN BUILDING MATERIALS UNIT UOM  TERMA BAYARAN PAY TERMS HARGA (RM) PRICE (RM)  JAN FEB MARCH APR MAY JUNE JUL AUG SEP OCT NOV Source of Data: This average price is compiled by Department of Statistic Malaysia MT = Metric Ton or Tonne, m² = Square Metre, m³ = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit 3 Konkrit Siap Bancuh  Ready Mix Concrete  22 Ready Mix Concrete - Normal Mix - Grade 15, Granite m 3   30 Del 179.80 179.80 179.80 179.80 179.80 179.80 179.80 179.80 179.80 179.80 179.80 23 Ready Mix Concrete - Normal Mix - Grade 20, Granite m 3   30 Del 184.60 184.60 184.60 184.60 184.60 184.60 184.60 184.60 184.60 184.60 184.60 24 Ready Mix Concrete - Normal Mix - Grade 25, Granite m 3   30 Del 191.53 191.53 191.53 191.53 191.53 191.53 191.53 191.53 191.53 191.53 191.53 25 Ready Mix Concrete - Normal Mix - Grade 30, Granite m 3   30 Del 199.00 199.00 199.00 199.00 199.00 199.00 199.00 199.00 199.00 199.00 199.00 26 Ready Mix Concrete - Normal Mix - Grade 35, Granite m 3   30 Del 213.80 213.80 213.80 213.80 213.80 213.80 213.80 213.80 213.80 213.80 213.80 Batu Bata Bricks  27 Common Clay Bricks - Pallet Piece 30 Del 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 28 Cement Sand Brick - Pallet Piece 60 Del 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 0.25 29 Smooth Face Facing Brick, Red Piece 30 Del 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 1.12 Bahan Bumbung Roofing   30 Interlocking Concrete Tiles - Standard Duotone Colour (Monier Elabana) Piece 60 Del 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 1.50 31 MS Decking - Lysaght Colourbond- Spandek Hi-Ten 0.47mm TCT m 2   60 Del 52.40 52.40 52.40 52.40 52.40 52.40 52.40 52.40 52.40 52.40 52.40 32 MS Decking -Lysaght Colourbond - Trimdek Hi-Ten 0.47mm TCT m 2   60 Del 48.67 48.67 48.67 50.87 50.87 50.87 50.87 50.87 50.87 50.87 50.87 33 MS Decking - Lysaght Colourbond -Kliplok Hi-Ten 0.53mm TCT m 2   60 Del 57.50 57.50 57.50 57.50 57.50 57.50 57.50 57.50 57.50 57.50 57.50 34 Corrugated Roofing Sheet- 76mm Double Width, 1065mm x 2440mm x 4mm (Hume/Malex/UAC) Sheet 30 Del    28.67 28.67 28.67 28.67 28.67 28.67 28.67 28.67 28.67 28.67 28.67 Besi Tetulang Steel Reinforcement   19 BRC A8, MS145 m 2   30 Del    10.11 10.11 10.21 10.21 10.16 10.16 10.16 10.16 10.16 10.16 10.16 20 BRC A9, MS145 m 2   30 Del    13.48 13.48 13.48 13.48 13.48 13.48 13.48 13.48 13.48 13.48 13.48 21 BRC A10, MS145 m 2   30 Del    16.64 16.64 16.64 16.64 16.64 16.64 16.64 16.64 16.64 16.64 16.64   Harga Bahan Binaan 2013 Negeri: JOHOR Building Materials Price 2013 State: JOHOR BIL BAHAN BINAAN BUILDING MATERIALS UNIT UOM  TERMA BAYARAN PAY TERMS HARGA (RM) PRICE (RM)  JAN FEB MARCH APR MAY JUNE JUL AUG SEP OCT NOV Source of Data: This average price is compiled by Department of Statistic Malaysia MT = Metric Ton or Tonne, m² = Square Metre, m³ = Cubic Metre, Del = Delivered, Ex = Ex-Factory, Ex-Quarry, Ex-Sand Pit 4 Jubin Lantai Dan Dinding Walls & Floor Tiles  35 Glazed Ceramic Floor Tiles, Standard Light Colour 200mm x 200mm x 8mm - Grade 1 Piece 60 Del 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 36 Glazed Ceramic Floor Tiles, Standard Light Colour 300mm x 300mm x 8mm - Grade 1 Piece 60 Del 1.90 1.90 1.90 1.90 1.90 1.90 1.90 1.90 1.90 1.90 1.90 37 Plain Homogeneous Floor Tiles, Standard Light Colour 200mm x 200mm x 8mm - Grade 1 Piece 60 Del 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 1.30 38 Plain Homogeneous Floor Tiles, Standard Light Colour 300mm x 300mm x 8mm - Grade 1 Piece 60 Del 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30 2.30 39 Glazed Ceramic Wall Tiles, Standard Light Colour, 200mm x 200mm x 6mm - Grade 1 Piece 60 Del 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 0.80 40 Glazed Ceramic Wall Tiles, Standard Light Colour, 200mm x 250mm x 6mm - Grade 1 Piece 60 Del 1.10 1.10 1.10 1.10 1.10 1.10 1.10 1.10 1.10 1.10 1.10 Bahan Siling Ceiling Board   41 Plain Cellulose Fibre Ceiling Sheet, 610mm x 1220mm x 3.2mm (UAC/ HUME/ MALEX) Sheet 60 Del 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 4.00 42 Plain Cellulose Fibre Ceiling Sheet, 610mm x 1220mm x 4.5mm (UAC / Hume/ Malex) Sheet 60 Del 6.78 6.78 6.78 6.78 6.78 6.78 6.78 6.78 6.78 6.78 6.78 43 Plain Gypsum Ceiling Board, 610mm x 1220mm x 9.5mm (Boral/Armstrong) Sheet 60 Del 4.97 4.97 4.97 4.97 4.97 4.97 4.97 4.97 4.97 4.97 4.97 Bahan Kerja Paip  Plumbing Works   44 Galvanised Iron Pipes Class A- 20mm Diameter (Maruichi), MS863 6m run 60 Del 35.50 35.50 35.50 35.50 35.50 35.50 35.50 35.50 35.50 35.50 35.50 45 Galvanised Iron Pipes Class B- 25mm Diameter (Maruichi), MS863 6m run 60 Del    58.83 58.83 58.83 58.83 58.83 58.83 58.83 58.83 58.83 58.83 58.83 46 Galvanised Iron Pipes Class C- 25mm Diameter (Maruichi), MS863 6m run 60 Del    71.68 71.68 71.68 71.68 71.68 71.68 71.68 71.68 71.68 71.68 71.68 47 PVC Pressure Pipes Class D, Grey Colour- 50mm Diameter (Paling), MS 628 4m run 60 Del    28.43 28.43 28.43 28.43 28.43 28.43 28.43 28.43 28.43 28.43 28.43 48 PVC Pressure Pipes Class E,Grey Colour - 25mm Diameter (Paling), MS 628 6m run 60 Del    11.40 11.40 11.40 11.40 11.40 11.40 11.40 11.40 11.40 11.40 11.40 49 HDPE Pipe PN 16 - 25mm Diameter, MS 1058 100m roll 60 Del    116.60 116.60 121.68 121.68 121.68 118.30 118.30 118.30 118.30 118.30 118.30 50 HDPE Pipe PN 16 - 50mm Diameter, MS 1058 100m roll 60 Del    457.50 457.50 477.36 477.36 477.36 464.00 464.00 464.00 464.00 464.00 464.00 51  ABS Pipe PN 15 Class E - 20mm, MS1419 5.8m run 60 Del    23.23 23.23 23.23 23.23 23.23 23.23 23.23 23.23 23.23 23.23 23.23

lecture_2

Jul 22, 2017
Search
Tags
Related Search
We Need Your Support
Thank you for visiting our website and your interest in our free products and services. We are nonprofit website to share and download documents. To the running of this website, we need your help to support us.

Thanks to everyone for your continued support.

No, Thanks
SAVE OUR EARTH

We need your sign to support Project to invent "SMART AND CONTROLLABLE REFLECTIVE BALLOONS" to cover the Sun and Save Our Earth.

More details...

Sign Now!

We are very appreciated for your Prompt Action!

x