Documents

Mechanical.qc

Description
Description:
Categories
Published
of 5
All materials on our website are shared by users. If you have any questions about copyright issues, please report us to resolve them. We are always happy to assist you.
Related Documents
Share
Transcript
  MUHAMMED THANZEEL QC MECHANICAL INSPECTOR E-mail: muhammedthanzeel666@gmail.com Mobile No: +966-580281560 OBJECTIVES: To obtain a position in which my academic and professional skills can be utilizedto the best of the organization where I have the responsibility and accountabilityfor using my skills and efforts to achieve great results. EDUCATIONAL QUALIFICATION:  Bachelor of Engineering in Mechanical Engineering From VTUniversity.PROFISIONAL QUALIFICATION:  Certified CSWIP 3.1 Welding Inspector, TWI Cambridge, U.K, Training & Certification Certification No: 360855  ASNT Level II – PT,VT,MT,UT & RTEMPLOYMENT HISTORY: 1. JAN 2018 TO MARCH 2019  1. QC MECHANICAL INSPECTOR  SIDEM SAUDI LTD MRAFIQ IWPP PROJECT    Review of ITP for Inspection and testing of the equipment .  Pre- cleaning Inspection of pressure vessels, Heat exchangers, columns .  Identifying Deposition of Sludge, scale, on the inner surface or pressure vessels, columns .  Post-cleaning inspection Heat exchanger, vessels, columns .   Identifying critical pipelines for inspection (visual, Thickness check, PMI, RT, MT, PT, VT).  Witnessing Non-Destructive examination and Review of Radiography.  Inspection of Fit-up of pipe, spool and weld visual inspection.  Inspection of short bolting of different static equipment’s like heat exchangers, pressure vessels, columns, valves.  Review of As-built drawing and check for approval as-built drawing  Inspection the face area of gasket.    Monitoring Of Hydro test of piping, heat exchangers, vessels  .  Prepare Final Inspection   2. OCT 2016 to NOV 2017  2. QC MECHANICAL INSPECTOR  GS NEOTEK SEP HALOBUTYL PROJECT , KEMYA  Material receiving of spools, valves, equipment, instruments and fittings.Ensuring that MTC, packing list, purchased order, serial number and anyessential document as per approved material.  Piping Inspection of Fit-Up, Orientation and Dimensional checking etc.  Inspection of value installation an preparing report.  Inspection of Piping fabrication and Erection of piping, spools, pipe-supports as per our drawings.  Ensure that all the Instruments are correctly managed and calibrated.Monitors the expiry date of calibration certificates.  Responsible for the overall quality control of all the construction activities atsite.  Assuring and controlling the work quality as per the approved specificationand drawings.  Review and inspection of hydro test packages, line check and punch listing  Witnessing of flange joint assembly and bolt torque.  Ensure the blinds are removed and correct rating gaskets are installed.  Inspection of gasket, supports, valves, prior to line reinstatement, acceptance  as per the latest drawing for construction, codes and specification standards.  Installation inspection of Static and rotary Equipments (Tank, motor, pump,compressor)  Attend weekly meeting and suggest any technique to advance productionwithout harming the quality of the work. 3. MAY 2015 to AUG 2016 3. QC MECHANICAL INSPECTOR  SINOPEC (SSEC) IBN RUSHD II PET II PROJECT (SABIC)  Review and endorse MTC’s and ensure they comply with the relevantSpecifications and Standards.  Tank Mechanical inspection as per drawing requirements and dimensionalinspection of fabrication components.  Inspection of Hydrostatic and Pneumatic Tests.  Witness necessary NDT such as penetrant testing, magnetic particle testing,ultrasonic testing and review of weld radiographs as per the applicablespecification  Raw material inspection: Visual inspection, Dimensional inspection, Verificationof correctness.  Monitoring all preservation status activity. 4. 25 Days Shut-down Project-2015 4.PETROSPECT INSPECTION SERVICES. KSA TASNEE PETROCHEMICAL PLANT  Checking for consistency with the Welding Procedure Specification (WPS)  Checking the Welders Qualification and that range of qualification shownmatches the application of WPS being used.  Ensuring the Approved WPS are available/posted at the site during welding.  Complying with the ITP (Inspection Test Plan) .  To carry out Fit up Inspection like Checking Root gap, Mismatch, Internal &External Alignment, Hi-Lo & Tack Welds before Welding.  Ensuring all the welding equipment and other measuring devices arecalibrated.  Reviewing filler wires and electrodes of welding procedure specification.   Monitoring and Controlling Welders Weekly Repair Rate as per SaudiAramco Engineering Standards.  Ensuring that there is no Cross-contamination between Stainless Steel andCarbon Steel Pipes/Supports.  Checking the Welders Qualification and that range of qualification shownmatches the application of WPS being used. 4. JUNE 2013 TO JAN 2015 4.QC ENGINEER  Aquafil Polymers LTD. MRPL (ONGC) Project, India  Review/Approval of Inspection and test plans and Method statements asrequired to construction activities.  Inspection of Pipes, Fitting, Flanges, Gaskets and spools arrived at site and preparing preservation plans Correlated with Test Certificate.  Supervising field installation to comply with GA drawing, isometric and  project specification.  Line checking and preparing punch list prior to release for hydro test, final mechanical completion activities. Reinstatement punch list activities, final inspection with client inspector prior to hand over.  Co-ordination with NDT contractor, painting & Insulation contractor. Witness final pressure tests, including verification that pressure gauges have adequate dial range and is calibrated. PERSONAL DETAILS: Name : Muhammed Thanzeel Nationality : Indian Iqama Number : 2470241528 Langauges Known : English, Hindi, Kannada, Malayalam.DECLARATION:  I hereby declare that all the details furnished above are true to the best of my
We Need Your Support
Thank you for visiting our website and your interest in our free products and services. We are nonprofit website to share and download documents. To the running of this website, we need your help to support us.

Thanks to everyone for your continued support.

No, Thanks
SAVE OUR EARTH

We need your sign to support Project to invent "SMART AND CONTROLLABLE REFLECTIVE BALLOONS" to cover the Sun and Save Our Earth.

More details...

Sign Now!

We are very appreciated for your Prompt Action!

x