Documents

Design of Temporary Excavation and Lateral Support System for the DSD Sheung Wan Stormwater Pumping Station

Description
Design of Temporary Excavation and Lateral Support System for the DSD Sheung Wan Stormwater Pumping Station
Categories
Published
of 36
All materials on our website are shared by users. If you have any questions about copyright issues, please report us to resolve them. We are always happy to assist you.
Share
Transcript
  1 Asia HKIE Technical Talk –ELS Design for SWSPS –18 June 2008 Design of Temporary Excavation and Lateral Support System for the DSD Sheung Wan Stormwater Pumping Station By Eric Li -GCG (Asia) Presented to the HKIE Geotechnical Division18 th June 2008 Asia HKIE Technical Talk –ELS Design for SWSPS –18 June 2008 Sheung Wan Stormwater Pumping Station (SWSPS)  2 Asia HKIE Technical Talk –ELS Design for SWSPS –18 June 2008 Project Set Up  DSD Contract DC/2006/10  Contract Sum: HK$ 78 million (approx)  Designer: Drainage Services Department (with GEO as in-house geotechnical consultant)  Site Supervision: DSD Drainage Project Division (with the engagement of an IGE)  Contractor: China National Chemical Engineering Group  ELS Designer: Geotechnical Consultant Group (Asia) Ltd.   Asia HKIE Technical Talk –ELS Design for SWSPS –18 June 2008 43m57mPile Cap Layout Plan   ~ -5.9mPD~ -7.1mPD  3 Asia HKIE Technical Talk –ELS Design for SWSPS –18 June 2008 43m Retaining WallPile Cap / Base Slab Typical North-South Section ~ +4.0mPD~ -5.9mPD~ -7.1mPD Asia HKIE Technical Talk –ELS Design for SWSPS –18 June 2008 Selection of Retaining Wall Type Wall Types Considered:ãDiaphragm WallãBored Pile WallãPipe Pile WallãSheet Pile Wall ãNo wall (open cut)Design Objectives:ãApproximate max. 10m deep excavationãEffective control of settlement due to excavation and groundwater drawdown  4 Asia HKIE Technical Talk –ELS Design for SWSPS –18 June 2008 Reclamation and Seawall Dredging Plan Approx. Location of Site Asia HKIE Technical Talk –ELS Design for SWSPS –18 June 2008 Typical Cross Section Vertical Seawall (Indicative) Approx. Extent of SWSPS Victoria Harbour

MTH 221 Week 2 #3

Jul 23, 2017
Search
Tags
Related Search
We Need Your Support
Thank you for visiting our website and your interest in our free products and services. We are nonprofit website to share and download documents. To the running of this website, we need your help to support us.

Thanks to everyone for your continued support.

No, Thanks
SAVE OUR EARTH

We need your sign to support Project to invent "SMART AND CONTROLLABLE REFLECTIVE BALLOONS" to cover the Sun and Save Our Earth.

More details...

Sign Now!

We are very appreciated for your Prompt Action!

x