Documents

Guidelines of - Sign Board & Site Fencing

Description
dm mob
Categories
Published
of 2
All materials on our website are shared by users. If you have any questions about copyright issues, please report us to resolve them. We are always happy to assist you.
Related Documents
Share
Transcript
  THE PALM JUMEIRAH Temporary sign boards and Construction Fencing  Materials and Specification All products must be capable of withstanding the harsh climate and environmental conditions of the UAE. All finishes and surface treatments are to be designed to withstand high levels of humidity, salt spray and sand abrasion. TECHNICAL INFORMATION Introduction These specifications outline minimum design standards in respect of construction sign board and temporary plot fencing. Construction Sign board Developer’s boards are required to feature a good deal of administrative information relevant to the development. However, it is the panels which contain the information (top) about the specific Owner development and the Developer identity (middle), which should be the most prominent. As an alternative to this, the top panel can contain marketing imagery relevant to the development. Imagery in this location should only be used when there are no opportunities for imagery in the preferred location, on the site hoardings, at ground level. Construction Site fencing  Fencing shall be placed on and/or inside the plot limit, unless otherwise approved by Nakheel.  Fencing Height shall be 6 meter from ground level (Mandatory for Palm Jumeriah plots).  Access opening through fencing shall be equipped with gates which shall be kept closed and locked when site is unattended.  Fencing shall be made of durable material, must be capable to withstanding the harsh climate and environmental conditions of UAE.  Fence color shall be white or Nakheel blue (Pantone ® 541)  Branding on site fence shall be prepared/submitted by the plot owner for Nakheel approval(NOC center), otherwise Nakheel branding shall be placed on the hoarding.StartOwner request info. From Nakheel Developer Relation Owner Submission for TrakheesApprovalTRK reviewNoYES NKL review Owner Coordinate with Security for AccessCommence Work YESNoOwner Submission for NKL Site Access Permission (SAP) Process & Procedures
Search
Similar documents
View more...
Related Search
We Need Your Support
Thank you for visiting our website and your interest in our free products and services. We are nonprofit website to share and download documents. To the running of this website, we need your help to support us.

Thanks to everyone for your continued support.

No, Thanks